Avis Builders and Design · Window & Door Installation
Window & Door Installation in San Jose, CA
Window and door replacement flashed and sealed so the opening stays watertight.
- Licensed & Bonded, CSLB #1142220
- TREX PRO & TimberTech PRO Certified
- Free In-Home Consultation
- Rated 5.0 on Google
Fast & Free
Request your free in-home consultation
Rated 5.0 on Google
Why Avis Builders and Design for window & door installation
Licensed & Bonded
CSLB #1142220 · B, General Building
One team, start to finish
Design, permitting and build run by the same general contractor.
Written scope before work starts
You approve the itemised scope, so the job is described before it is priced.
Window & Door Installation across Santa Clara County and the greater Bay Area
A replacement window is not really a window job. It is a hole in a wall that has to keep shedding water long after the crew has driven off, and the unit you choose is the least interesting part of that. Most of the leaks a contractor gets called back for were built around a perfectly decent window: vinyl, dual pane, respectable numbers on the label, set into an opening with no sill pan under it, or flashed in an order that routed water behind the wall instead of out of it.
Avis Builders and Design replaces windows and exterior doors across San Jose and Santa Clara County under CSLB #1142220, a Class B General Building license. The scope covers pulling the old units, inspecting and repairing what is behind them, setting the new ones level and square, flashing and sealing the opening so it drains, and putting the interior and exterior trim back so the wall reads as if nothing happened. Where an opening changes size or a new one gets cut, the header and the permit are part of the job rather than somebody else's problem.
Call (408) 208-0551 free estimate.
What window & door installation actually involves
There are two honest ways to replace a window, and the choice is not a matter of taste. An insert replacement, which most contractors call a retrofit, sets the new unit inside the existing frame after the old sash and hardware come out. The original frame stays in the wall, the stucco or siding around it is never disturbed, and the interior casing usually survives untouched. It is quicker, it is far less disruptive, and on a sound opening it is a legitimate installation rather than a shortcut.
What you give up is glass. The new frame nests inside the old one, so each opening loses roughly an inch of daylight per side, which is obvious on a small bathroom window and barely registers on a wide slider. You also give up the chance to see anything. Whatever the original installer did or failed to do at the sill stays buried behind a frame nobody opened. A full-frame replacement takes the whole old unit out down to the framing.
Read more
The rough opening is exposed, the sill can be inspected and repaired, flashing goes in from scratch, and the new window is fastened to the structure rather than to the carcass of the old one. It also restores the original opening size. The cost is that stucco has to be cut or siding removed, flashing has to be integrated back into the building paper behind that cladding, and the cut has to be patched. Homeowners consistently underestimate that patch.
Matching the texture and color of plaster that has been weathering for thirty years is difficult work, and the honest outcome is usually close rather than invisible, which is why an elevation often gets repainted afterward. Removal is where the surprises live. On a house with any history of water at a window, the damage sits below what you can see, in the sill framing and the sheathing at the lower corners, because that is where water collects once it gets past the perimeter.
It gets probed before anything is ordered around it. Soft wood at a sill means cutting back to sound material and sistering or replacing framing, and on a bearing wall that is structural work rather than carpentry. Found during the survey, it is a line item with a number attached. Found after the new units are on site, it is a scheduling problem for everyone. Flashing is the part of this job that decides whether the opening leaks years from now, and it reduces to one idea: every layer laps over the layer below it, so water traveling down the wall stays outside of everything.
The sill goes in first as a pan, either a self-adhered membrane or a formed tray, running a few inches up the jambs, turned up at the back to make a dam and closed at both ends so anything landing in it has to drain outward. The window is then set into sealant at the jambs and across the head, and the sill is deliberately left unsealed. That detail catches people out, because it looks like a gap somebody forgot.
It is the drain path. Insulated glass units and frame corners all pass a little water eventually, and the pan needs somewhere to send it; sealing the sill closed converts the pan into a bathtub. After the unit is fastened, jamb flashing goes over the nailing fins and laps onto the pan, head flashing goes over the jambs, and the housewrap or building paper above the window laps over the head flashing rather than under it.
A head flashing tucked behind the weather barrier is a reverse lap, which is the most common installation defect in the trade. By the time it shows up on interior drywall, the sheathing has been getting wet every winter for years. Setting the unit is fussier than it looks. The window has to sit level, plumb and square inside an opening that is frequently none of the three, so it gets shimmed at the fastening points and under the sill where the frame needs bearing, and the diagonals are measured rather than eyeballed.
A frame racked a quarter inch out of square looks fine from the driveway and will not lock, because the hardware is the first thing to complain. The sash gets operated before the fasteners are driven home rather than after. The cavity between frame and framing is filled with low-expansion foam, since standard foam has more than enough force to bow a vinyl jamb inward and bind a sash, and the remedy for that is taking the window back out.
Outside, the perimeter joint gets backer rod where it is wide enough to need it and a sealant rated for the substrate, tooled so it bonds to the two faces of the joint and not to the back of it. Exterior doors follow the same water logic with a harder mechanical problem attached, because a door is a moving part somebody uses several times a day. The threshold sits on a sill pan for the same reason a window does.
The sill under it has to be fully supported and dead flat, so a hollow gets shimmed solid before the unit goes in; a dip under a patio slider shows up later as a panel that drags and rollers that wear out early. The frame has to be plumb in both planes, because a door out of plumb side to side swings itself open or closed and no amount of strike adjustment fixes that. The weight of the slab hangs from the top hinge, so long screws through that hinge into the king stud rather than into the jamb alone are what keep a door from settling into its own sill over a few seasons.
Weatherstripping has to compress evenly around the perimeter, an adjustable threshold is set against the sweep by feel with the door closed, and a deadbolt should throw into a reinforced strike anchored to framing, since a strike plate held by three-quarter-inch screws into soft jamb material is decoration. Several code items settle what can even be ordered, before anyone discusses style. Safety glazing is required in what the code calls hazardous locations, which includes glass in doors, fixed panels next to doors, glazing close to a walking surface, glazing in and around tubs and showers, and glass near stair landings.
A unit ordered without tempered glass where tempered is required does not pass inspection and has to be reordered. Bedrooms need an emergency escape and rescue opening, and this is where insert installations can quietly cause a problem, because nesting a new frame inside the old one shrinks the clear opening and a bedroom window that was marginal before can fall under the minimum after. Changing operating type does the same thing, since a horizontal slider gives you roughly half the clear opening a casement of the same size gives you.
Title 24 sets the energy performance of the glass through U-factor and solar heat gain coefficient, with the required values depending on the climate zone and the compliance approach on the permit, and those figures come off the NFRC label rather than off a sales sheet. Anything that changes the size of an opening pulls in structure: a header sized for the span and the load above, and an engineer where the wall is doing shear work.
The local housing stock makes some of these conversations predictable. A great deal of San Jose went up between the early fifties and the late seventies, and those houses tend to carry single-pane aluminum sliders in stucco walls, with frames that conduct heat straight through and sashes riding on brush seals rather than compression seals. Older neighborhoods nearer downtown hold wood double-hungs that are often worth repairing instead of replacing, because they were built from old-growth material that outlasts anything sold at a lumberyard now.
What a homeowner notices is frequently not the actual defect. Fog between the panes means the seal on the insulated glass unit has failed, which is a glass problem rather than a frame problem, and on many units the glass or the sash alone can be replaced. Moisture on the interior face of the glass on a cold morning is usually humidity inside the house. A draft you can feel with a hand near a closed window is very often air moving through the gap between frame and framing behind the casing, and that is a foam and sealant repair costing a small fraction of a replacement. Somebody should tell you that before selling you twelve windows.
How to decide what you need
Start by working out whether you have a replacement problem at all. Fogged glass, a lock that will not engage, a sash that binds, a draft along the casing line: each of those has a repair path well short of new units, and a contractor who inspects before quoting can tell you which one is in front of you. Whole-house replacement earns its cost when the frames themselves are the weakness, which usually means original aluminum with no thermal break, wood that has gone soft at the sills, or units so far out of adjustment that the hardware has nothing square to work against.
Once replacement is the answer, the insert-versus-full-frame question resolves on evidence more than preference. Any staining, softness or history of water at a sill means the opening has to be opened, so full-frame. Stucco in good condition over sound openings, with a small loss of glass area acceptable, points to an insert installation that leaves a wall alone while it is still doing its job. If an elevation is already being re-sided or re-plastered, do the windows in the same pass and do them full-frame, since the flashing can then be integrated properly with the new weather barrier and the patching is happening regardless.
Read more
Frame material is a set of tradeoffs rather than a ranking. Vinyl insulates well, needs no finishing and is the least expensive route, but it moves with temperature, and dark colors on a west-facing wall push that movement further than light ones do. Fiberglass is dimensionally stable, expands at close to the same rate as the glass it holds, takes paint and costs more. Wood is the most pleasant thing to live with and the most demanding to keep, so it generally shows up as a clad unit with wood inside and fiberglass or aluminum facing the weather.
Aluminum buys the thinnest sightlines, which is why architects reach for it, and it conducts heat unless the frame has a genuine thermal break in it. Operating type matters more than most people expect. A casement pulls its sash against a compression gasket as you crank it shut, which is why casements generally test tighter for air leakage than sliders and single-hungs, where the moving sash slides past a brush seal. If one room has been the drafty one for a decade, the operating type is part of that story and swapping like for like will carry the problem forward.
Then the diligence, which is unglamorous and worth doing. Ask about the sill: specifically, what goes into the opening before the window does, whether the bead of sealant under the unit is continuous or deliberately left open, and what the head flashing laps over versus what laps over it. Those answers separate people who install windows from people who set them in a hole and caulk the edges. Look up the license number yourself on the state registry, where the classification, the bond and the workers compensation coverage are all published, and get the written scope of work and the schedule before the deposit rather than after it.
Our Process: Window & Door Installation
The Avis Builders and Design window & door installation process
Every window & door installation job runs the same four stages.
-
Step : 01
Free in-home consultation
Someone comes to the house, walks the openings with you, and listens to which rooms have been the problem. Drafts, condensation, a door that has to be shouldered shut, a window that has not opened since you moved in. This is also the moment to mention water stains, however old, because they change what gets looked at.
-
Step : 02
Survey and measurement
Every opening is measured on its own rather than assumed to match its neighbor, including wall depth, existing frame condition, sill condition, and the handing and swing of each door. Diagonals get checked so a wildly out-of-square opening is known about in advance. Suspect sills are probed. Units are made to these measurements, so this step is where accuracy is cheap.
-
Step : 03
Product selection and Title 24 documentation
Frame material, operating type, glass package and hardware get chosen against how each opening is actually used and how much sun it takes. The fenestration values needed for the permit are documented from the NFRC ratings of the specific units being ordered rather than assumed from a category.
-
Step : 04
Permit where the work requires one
Replacement work and any change to an opening are submitted to the correct agency, which is the City of San José for properties inside the city and Santa Clara County for unincorporated parcels. Where an opening is being enlarged or created, the header design and any engineering go in with the application.
-
Step : 05
Removal and opening repair
Old units come out, and the openings are inspected before anything new goes near them. Rot in sill framing or sheathing is cut back to sound material and repaired. Old flashing that was installed wrong is corrected rather than covered up, which is the whole reason for opening the wall in the first place.
-
Step : 06
Set, flash and seal
Sill pan in first with closed ends and a back dam. The unit is shimmed level, plumb and square, checked on the diagonals, operated before it is fastened off, and foamed with low-expansion foam. Jamb flashing laps the pan, head flashing laps the jambs, and the weather barrier above laps the head. The exterior perimeter joint is backed and sealed.
-
Step : 07
Trim, patch and finish
Interior casing and stool are installed or reinstalled, drywall and paint edges are patched, and exterior trim, stucco or siding is repaired at anything that was cut. Sealant joints are tooled. The unit is adjusted and left operating the way it should before anyone calls it done.
-
Step : 08
Inspection and final walkthrough
Required inspections are scheduled and passed, with the NFRC labels still on the glass for the inspector. Then the work is walked with you against the agreed scope: every unit opened, closed and locked, the reveals looked at, and anything on the list handled before the job closes out.
Real Reviews
What our customers say
Wonderful company that helped build a railing on our deck. Shay, from Avis Builders and Design, was prompt, answered all my many, many questions, and helped to create a wonderful final product. Everything was explained well and the price was very reasonable. I cannot recommend them enough!
We recently hired Avis Builders and Design to make long needed repairs and restore the finish on our redwood deck. Everything went smoothly from start to finish. Project manager Shay assessed the job and made sure all our questions were answered and needs met for a fair price. Oscar and crew mate were on time, courteous, and efficient and completed the work as outlined in our contract. Very happy we chose Avis to do the job. Definitely recommend Avis Builders.
We contacted Avis Builders and Design because we wanted to remodel several areas of our home, including the kitchen, bathrooms, flooring, painting, and a few other updates throughout the house.
Shay was great to work with from the beginning. He explained everything clearly, helped us understand our options, and made the whole process feel much more organized. There were a lot of details to figure out, but Shay helped coordinate everything, including the design side and communication with the engineer when needed.
The team did a great job, paid attention to the details, and we're very happy with how everything turned out. We would definitely recommend Avis Builders and Design to anyone looking for a reliable remodeling contractor.
FAQs
Frequently asked questions: window & door installation
Can you replace my windows without tearing into the stucco?
In most cases, yes. An insert or retrofit installation sets the new window inside the existing frame, so the stucco and exterior trim around the opening are never cut. It is the usual approach on the stucco houses that make up much of San Jose's housing stock. The tradeoffs are real and worth knowing: the new frame nests inside the old one, so you lose roughly an inch of glass per side, and nobody gets to see the condition of the sill framing or the original flashing. Where there is evidence of past water at an opening, opening the wall is the right call even though it means patching afterward.
What is the difference between a retrofit and a full-frame replacement?
A retrofit keeps the existing frame in the wall and installs the new unit inside it. A full-frame replacement removes everything down to the rough framing, which exposes the sill for inspection and repair and allows a new sill pan and new flashing to be installed and lapped correctly into the weather barrier. Full-frame costs more, takes longer, and requires cutting and patching cladding. It is the right answer when there is rot, when the original flashing was done wrong, when you want the original glass area back, or when the exterior is being redone anyway.
Do I need a permit to replace windows in San Jose?
Window and door replacement generally requires a permit, and it certainly does when an opening changes size or a new opening is cut, because that involves a header and possibly the lateral bracing of the wall. Avis Builders and Design pulls the permit under CSLB #1142220 and schedules the inspections. Properties inside the city go through the City of San José; unincorporated parcels go through Santa Clara County. Requirements and fees are set by the agency, so those get confirmed for your address rather than quoted from memory.
My windows are fogged between the panes. Do I need whole new windows?
Not necessarily. Fog or haze between the panes means the seal on the insulated glass unit has failed and the space between the panes is no longer sealed. That is a glass failure, not a frame failure, and on many units the glass unit or the complete sash can be replaced while the frame stays in the wall. Whether that makes sense depends on the age and condition of the frame, whether the hardware is still available, and how many units are affected. Moisture forming on the room side of the glass is a different issue entirely and usually points to humidity inside the house rather than a defective window.
Do new windows have to meet California energy requirements?
Yes. Title 24 sets performance standards for fenestration, expressed as U-factor for heat conduction and solar heat gain coefficient for how much solar energy the glass admits. The required values depend on the climate zone your address falls in and on the compliance approach used for the permit, so the units are specified to the numbers your project actually needs. Those ratings are certified on the NFRC label attached to the glass, and that temporary label should stay on until the inspection is done, since the inspector reads it.
Are you licensed, and which cities do you cover?
Avis Builders and Design CORP holds California contractor license CSLB #1142220, a Class B General Building classification, with a $25,000 bond and workers compensation coverage through the State Compensation Insurance Fund. You can verify the license, its status and its classification yourself on the state registry rather than take anyone's word for it. Work covers San Jose, Santa Clara, Sunnyvale, Cupertino, Mountain View, Los Gatos and Campbell, plus the surrounding Silicon Valley communities. This is a service-area business, so the consultation happens at your property. Call (408) 208-0551 or email info@avisbuildersanddesign.com.
Where We Work
Serving Santa Clara County and the greater Bay Area
More exterior remodeling services
Deck Building
Custom decks, stairs and railings in composite or wood, built to the manufacturer's published spans and fastener details.
Learn More →Pergolas & Gazebos
Shade structures engineered and anchored for the deck or patio they sit on.
Learn More →Landscaping
Hardscape and softscape work that finishes the yard around the house we just remodeled.
Learn More →Exterior Siding & Painting
Siding repair and replacement plus exterior painting that protects the walls, not just the color.
Learn More →